What Architects, Subs, and GCs All Miss About Scope
Most construction blowups don’t come from missing info—they come from unspoken assumptions. Before the project starts, run a Scope Assumptions Audit and align every stakeholder.

Gil Rosa
Jun 132 min read


How to Avoid Losing Time Every Morning on the Job site
The Morning is a new start, getting it right is critical Every morning, somewhere on a job site, a crew is standing around waiting,...

Gil Rosa
Jun 103 min read


The Designer's Code: 6 Rules for Leading Projects from Sketch to Site
Because drawings don't build buildings—people do. Great design doesn't just come from inspiration. It comes from understanding what it...

Gil Rosa
Apr 233 min read


Stop Competing on Price—Start Competing on Systems
When work gets tight, it’s tempting to compete on price just to keep projects moving. But long-term success isn’t built by being the cheapest—it’s built by being the most reliable. Builders who compete on systems—tight proposals, smart schedules, clean cash flow, and strong leadership—win better projects, protect their margins, and build lasting reputations. Learn how to shift from price wars to smart wins.

Gil Rosa
Apr 212 min read


How to Go from GC Tool to Trade Partner
If you’re tired of being treated like just another disposable subcontractor, it’s time to level up. In this post, we break down how to shift from GC tool to respected trade partner—by mastering your contracts, protecting your value, choosing better jobs, and acting like the strategic business you are. Stop taking scraps. Start commanding the respect, rates, and roles you deserve.

Gil Rosa
Apr 173 min read


Why Your Construction Schedule Is Lying to You (And What to Do About It)
Why Your Construction Schedule Is Lying to You: Most construction schedules look good on paper—but fall apart in the field. Delays, trade stacking, and constant rework aren’t random—they’re the result of broken systems. In this post, we break down the 7 deadly scheduling sins that quietly sabotage your projects—and introduce a smarter solution: a hybrid Takt + CPM system that brings clarity, control, and real results. Stop building on guesswork. Start scheduling for reality.

Gil Rosa
Apr 163 min read